Friday, April 18, 2008

Construction Update April 18, 2008

The front of the Ocean House, the wood on the right side shows where an air shaft will be.


The above image shows, shoring, the method used to hold up the concrete walls while the surrounding areas are backfilled. Shoring allows for extra support and are removed when the steel is set in place.

An image of the bulldozers backfilling. Note the beautiful Atlantic Ocean in the background!